Alectra Service Yard

Project Scope

Supplied and installed pre-cast concrete blocks to create material loading bays.

Materials Used

Pre-cast concrete blocks

Challenges & Solutions

  • Working on new asphalt while handling heavy concrete blocks required extra care to avoid surface damage. A rubber track excavator was used to protect the asphalt while placing the blocks.

Results & Outcomes

  • Five material loading bays were created

Technical Specifications

Approximately 60+ pre-cast concrete blocks were set, stacked two courses high.

Industrial Retaining Wall

Project Scope

The site was excavated for the concrete footing, and a reinforced concrete slab was poured. A pre-cast concrete wall was then set in place with proper drainage and tie-back systems installed. The area was backfilled and compacted using the right materials, with drainage and hydrostatic pressure kept top of mind.

Materials Used

Concrete, pre-cast concrete blocks, weeping tile, geotechnical tieback mesh, 3/4 clear gravel, topsoil, 3/4 crusher run

Challenges & Solutions

  • The site had limited space for staging materials, and the hillside was steep and unstable. Working in the city core also meant moving and operating large equipment in a tight area with limited access.

Results & Outcomes

  • The existing parking lot was expanded by nearly 70%, giving the client significantly more usable space.

Technical Specifications

A 50 linear foot pre-cast concrete wall was installed, stacked five courses high.